Friday, December 17, 2010

Wednesday

Today it was production day in our class. I was apart of the set crew, but we mostly pulled out masonite to lay down on the stage. We worked fast, but however we didnt lay it down right the first time, and then we had to stagger it. Production I am not very fond of, I'm just not the physical lifting and technical type of guy.

P.G. : 100

Today I deserve a 100 because I paid attention and did what I was supposed to do. I listened to Lindsey, and as fast as I could I opened the pit and dug through the masonite. And then we messed up laying it down, but I quickly helped fix it. And then I helped tape down the masonite with thin strips of gaff tape which was difficult.

No comments:

Post a Comment